Water mains and street reconstruction
The east Dallas water grid includes cast iron that has been in the ground since before the war, and replacement crews are working it street by street. A Dallas main job holds one standard unit and a handwashing station at the staging end, and both move down the block as the tie-ins are completed.
Street reconstruction in Dallas brings the same problem from a different direction, with panels out and half the block on plate steel. We ask the Dallas superintendent which intersection stays open, because a loaded service truck will not cross a trench that has only been sand-filled.
Industrial yards and light manufacturing
East of downtown Dallas the old industrial pockets along Samuell Boulevard and the rail spurs still run fabrication shops, pipe yards and equipment lots. A Dallas yard keeps one standard unit near the gate on long-term rental, serviced weekly so the drivers and the shop crew share something that stays clean.
Plant shutdown weeks in Dallas change the numbers fast, with a contract crew arriving for a short turnaround and leaving again. For those we bring a temporary bank into the Dallas yard, add a handwashing station at the lunch trailer, and pull everything the day the crew demobilises.
Mid-century neighborhoods and roof season
The brick ranch streets across east Dallas are now past sixty years old, and they turn over through foundation work, re-roofs, window replacement and kitchen rebuilds. A Dallas remodel of that type takes one standard unit on the driveway, set where the dumpster and the unit are not competing for the same space.
Hail is the other constant in Dallas, and a single storm cell can open hundreds of roof claims across a few zip codes overnight. We hold spare standard units for those Dallas weeks so a roofing contractor working five streets is not rationing restrooms between crews.
