The heritage district and the original blocks
The oldest part of Irving is a compact grid of small commercial buildings and modest houses near the original townsite. An Irving shopfront rebuild in those blocks keeps one standard unit in the rear service lane, since the walking path out front is narrow and stays open to pedestrians.
Street and civic events around the Irving heritage blocks close roads on short notice for markets and seasonal gatherings. We drop the Irving units before the barricades appear and collect afterwards, which keeps the truck out of the closure entirely.
Mid-century streets and the remodel cycle
The neighborhoods spread south and east of the old center of Irving went up in the fifties and sixties and are now being renovated rather than replaced. An Irving remodel takes a single standard unit on the driveway apron, set so the dumpster and the crew truck are not competing for the same frontage.
Foundation repair runs constantly across Irving, where clay under those slabs moves with every wet and dry swing. An Irving pier job keeps the unit at the curb line for a week or two while the crew works in tunnels beneath the house.
Water mains, paving and the river ground
Main replacement in Irving runs block by block behind steel plate, and the unit travels with the tie-ins rather than sitting at the first address. We ask the Irving superintendent which intersection stays open, because a service truck has no business crossing a trench that is only sand-filled.
Ground near the Elm Fork in Irving is low, sandy in places and slow to drain after a spring storm. Crews working those Irving sites keep the unit up on the made road, since anything set on the flat will settle out of level within days.
