Street and drainage reconstruction
Mesquite built out fast in the sixties and seventies and the concrete streets from that era are now being taken out panel by panel. A Mesquite reconstruction crew works a block at a time with the whole surface open, so the unit sits inside the barricades at the closed end.
Storm drainage goes in alongside the Mesquite paving work, which means deep excavation in ground that holds water. Crews in Mesquite tell us which side of the trench stays drivable, because a loaded service truck will not cross a cut that has only been sand-filled.
Arena nights and the event grounds
The rodeo arena and the grounds around it give Mesquite a steady run of weekend events through the warm months. A Mesquite arena weekend takes a bank of standard units on the gravel and asphalt lots, with a deluxe flushing unit near the hospitality end and handwashing stations at the food row.
Loading and stock movement dictate everything at a Mesquite arena event, so placement is agreed with the grounds crew before we arrive. We drop the Mesquite units early on the Friday and pull them Monday, which keeps our truck out of the stock trailer traffic.
Industrial yards along Military Parkway
The industrial spine of Mesquite runs along Military Parkway and the rail frontage, with fabrication shops, distribution yards and equipment lots. A Mesquite yard keeps one standard unit near the gate on long-term rental, because contractor crews are seldom given the run of a plant washroom.
Those Mesquite rentals run for months and the yards ask for weekly service with a handwashing station near the break area. We set each Mesquite unit on the concrete apron rather than the gravel, since trailers swinging wide will clip anything left in the drive lane.
