The old downtown blocks
Downtown Royse City is a couple of short brick blocks beside the rail line, and those buildings are being brought back one at a time. A Royse City building restoration keeps one standard unit in the rear alley, because the walking path out front is narrow and the neighboring shops stay open.
Street events and market days close the Royse City blocks for a weekend at a time through the cooler months. We deliver into Royse City before the barricades go in, and collect on the Monday once the vendor trailers have cleared out.
Utility extensions and new mains
Water and sewer is being pushed out from Royse City along the farm roads to serve ground that had nothing but pasture a few years ago. A Royse City main crew works a long, thin site, so the unit and handwashing station sit at the stringing point and move with the pipe.
The blackland around Royse City turns to grease after a storm and a trench that walked fine on Friday is a rut field by Monday. We ask the Royse City foreman for a rocked crossing, since a loaded truck has no business out on a soaked easement.
Interstate frontage and county roads
Everything commercial in Royse City hangs off the Interstate 30 frontage, where ramp work, turn lanes and pad sites run most of the year. A Royse City frontage job puts the unit at the closed end of the taper behind the barrier, where a service truck stands fully off the lane.
The county roads around Royse City have deep bar ditches and narrow shoulders that slump after a wet winter. We set each Royse City roadside unit on a gravel apron or a flat roadside strip rather than the edge above a ditch.
