Seventies streets and the first rebuilds
The original sections of The Colony went up in a short burst in the seventies, which means roofs, fences and kitchens across whole streets are failing on the same timetable. A remodel in The Colony takes one standard unit on the driveway apron, positioned so the dumpster and the crew truck both still fit.
Buyers in The Colony increasingly gut a house back to the studs rather than patch it, which stretches a job to months. We keep the unit at that address in The Colony for the whole program, with weekly service once several trades are working together.
Water lines under the original sections
Water and sewer in the oldest part of The Colony went in with those first streets and is now being replaced block by block. A utility crew in The Colony works behind barricades with parked cars either side, so the unit sits at the closed intersection rather than mid-block.
Paving repairs follow the pipe work through The Colony, with panels lifted and the base open for days at a time. We ask the superintendent in The Colony which intersection stays drivable, because backing a loaded truck past fresh backfill is not worth the risk.
Shoreline erosion and park repairs
The lake side of The Colony takes wave and wind damage, and bank stabilisation, ramp repairs and trail work come round every few years. A shoreline crew in The Colony gets the unit up on the parking level, since ground close to the water will not carry a loaded truck.
Wind across Lewisville Lake reaches the exposed pads in The Colony with nothing to slow it. Every unit set on an open shoreline lot in The Colony is pinned or ballasted before the driver leaves the site.
