Teardowns and rebuilds on small lots
Lots across University Park are narrow and fully built, and a rebuild fills almost the entire parcel from setback to setback. A University Park build keeps its standard unit at the alley edge of the lot, because the frontage has to stay usable for deliveries and the street parking is restricted.
Those University Park jobs run the better part of a year, cycling through demolition, forming, framing and a long finish phase. We keep a single University Park unit in place for that whole program and step service up whenever several trades stack on site.
Alley access and the service route
Nearly every block in University Park is served from a rear alley barely wider than a truck, with garages and fences on both sides. Our drivers work out the University Park entry end before delivery day, since one parked contractor van will close the run completely.
Skips, portable toilets and material lifts all compete for the same University Park alley space during a rebuild. We position the University Park unit at the alley mouth where a service truck can reach it without threading past a loaded skip.
Campus edge turnover and grounds work
The blocks against the University Park campus edge turn over hard each summer, with student rentals gutted and repainted between leases. A University Park turnover job takes a standard unit on the driveway for a few weeks, since the interior bathrooms are usually out of service.
Park and street grounds work in University Park runs through the same summer window while traffic is light. We set those University Park units on the paved edge, keeping them clear of the irrigation and the mature street trees the city protects.
